How Long Does an Egress Permit Take in Denver? (Real Timeline)

If you're planning to add an egress window to your Denver basement—whether for a bedroom conversion, legal rental unit, or safety upgrade—you're probably wondering how long the permit process will take. The honest answer? It depends on several factors unique to Denver's building department and your specific project.

At Affordable Egress Co., we've been installing egress windows across Denver and the Front Range since 1999, and we've guided hundreds of homeowners through the permit process. In this guide, we'll break down the real timeline you can expect, what affects the approval speed, and how to avoid common delays.

The Typical Denver Egress Permit Timeline

From submission to approval, most Denver egress window permits take 5 to 10 business days. However, this can vary significantly based on how complete your application is and how busy the Denver Building Department is at any given time.

Here's the general breakdown:

In the best-case scenario with a complete, correct application, you could have your permit in hand within 5 business days. If the building department requests revisions—which happens frequently with basement projects—add another week to that timeline.

What Slows Down Egress Permit Approvals in Denver

Several factors can extend your permit timeline beyond the typical 5–10 days. Understanding these common delays can help you prepare and avoid them.

Incomplete or incorrect applications are the leading cause of delays. The Denver Building Department requires specific information about your basement's existing conditions, the proposed egress window size, the window well design, and how the installation will comply with the 2021 International Building Code (which Denver has adopted). Missing details—especially regarding soil type or foundation depth—send applications back for revision.

Foundation and soil-specific issues can also complicate approvals. Denver's clay soil and the varying depths of basements across the metro area mean that foundation analysis is often required. If your application doesn't adequately address how you'll handle the local soil conditions or if the building department wants a structural review, expect delays. This is especially common in older Denver neighborhoods where foundation depths vary widely.

Busy building department periods happen too. During spring and summer, the Denver Building Department experiences higher volume, which can add days to processing times. Fall and winter typically see faster approvals.

Egress window well requirements also trip up applicants. Denver requires window wells to meet specific depth and width requirements based on the room they serve. If your proposed well doesn't meet these standards, you'll need to revise your plans and resubmit.

Tips to Speed Up Your Denver Egress Permit

While you can't eliminate the processing timeline entirely, you can definitely avoid unnecessary delays. Here's what we recommend:

  1. Work with a contractor familiar with Denver requirements. We've installed thousands of egress windows in Denver and know exactly what the building department expects. A contractor who knows the local code can prepare submissions that pass on the first try.
  2. Provide detailed site information upfront. Include measurements of your basement depth, photos of existing conditions, soil type information if available, and details about your foundation. The more complete your application, the faster approval moves.
  3. Submit during off-peak seasons. If timing is flexible, submit applications in fall or winter for potentially faster processing.
  4. Ask about digital submissions. Denver accepts digital permit applications, which can sometimes move through the system faster than paper submissions.
  5. Plan for contingencies. Even with a perfect application, budget an extra week into your timeline. This prevents stress if the building department requests clarification or revisions.

From Permit Approval to Installation

Here's the good news: once your permit is approved, the actual installation work can happen fast. Most egress window installations, including concrete cutting through your basement wall and window well installation, can be completed in a single day. This means you're not looking at weeks of disruption to your home.

After installation, you'll need a final inspection—typically scheduled within a few days—to verify the work meets code before your permit is officially closed out.

The total timeline from permit application to completed, inspected installation usually runs 3–4 weeks, assuming you start with a complete application and the weather cooperates for the concrete work.

Get Started With a Free Estimate

If you're planning an egress window project in Denver, the best first step is a free, no-obligation estimate. We'll assess your specific basement conditions, discuss the permit requirements you'll face, and give you a realistic timeline for your project. With over two decades of experience, we know Denver's building codes, local soil conditions, and the ins-and-outs of the permit process. Let us handle the details so you can focus on expanding your living space safely and legally.

Ready for a Free Estimate?

Most installs completed in a single day. Serving Denver and the Front Range since 1999. Call or submit online — we respond fast.

Call (720) 691-8647